PENINGKATAN PRODUCTIVITAS DUMP BODY TRUCK MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING Studi Kasus di PT. XYZ - Tangerang
Abstract
needs to the needs of the growing impact of supporting the production of mining equipment. PT. XYZ is
one of the companies supporting the production of mining equipment manufacturers are one of them is
the Body Dump Truck. Body Dump Truck demand in 2013 increased from the previous year 2011 was
only 120 units per year to 180 units per year. In the effort to deal with the demand, increased
competition, cost pressures, the need to improve the performance of their manufacturing operations
offer the Lean Manufacturing methods, tools, and heuristics to improve the effectiveness and efficiency
in manufacturing.
The purpose of this study is to provide the proposed increase in production capacity by identifying and
balancing the work process that occurs in every work process production line must be equal or below
tact time.
The results of this study may indicate that the application of the production process of the proposed
Dump Truck Body can be achieved from the monthly average of 10 units to 18 units. Jig fixture use a
method very effective and efficient production processes, this is evidenced by the decrease cycle time.
For each Sub-Assy previously had to be done with the two man power into one man power, and the
lead time decreases. It's very good impact for companies to reduce operating costs of production as
low as possible.
Keywords: Produktivitas, Lean Manufacturing, Cycle Time, Man Power, Production.
Full Text:
PDFReferences
DAFTAR PUSTAKA
Abuthakeer, SS., P.V. Mohanramm, G.M.,
Kumar (2010), Activity Based Costing
Value Stream Mapping: International
Journal of Lean Thinking 1(2), 2-8.
Abdulmalek, F.A. dan Rajgopal, J. (2007),
Analyzing the Benefits of Lean
Manufacturing and Value Stream
Mapping via Simulation: A Process
Sector Case Study. International
Journal of Production Economics,
(7), 223 – 236.
Asmita Joshi, (2013), Implementation of
Kaizen as a continuous improvement
tool - A case study: International EJournal
of Ongoing Research in
Management And IT , 2(1), 2-8.
Chakravorty, S.S., (2010), An
Implementation model for lean
programs: European Journal of
Industrial Engineering, 4(2), 228-248.
Douglas M. Stewart and John R. Grout
(2004). The Human Side of Mistake-
Proofing, Production and Operations
Management. 10 (4), 440-459.
EMILIANI, M. L. (2004), Using value-stream
maps to improve leadership: The
Leadership & Organization
Development Journal, 2(5), 622-645.
Grewal, C. (2008), An iniative to implement
lean manufacturing using value stream
mapping in a small company, Int J.
Manufacturing Technology and
Management, 15(3-4), 404-417.
Hines, P. and Rich, N., (1997), The Seven
Value Stream Mapping Tools: Lean
Enterprise Research Centre, Cardiff
Business School, Cardiff, UK, 5(3), 46–
Ibon Serrano Lasa, Carlos Ochoa Laburu and
Rodolfo de Castro Vila, (2008), An
evaluation of the value stream mapping
tool: Business Process Management
Journal, 14(1), 39 – 52.
K.Velmanirajan, G. Raja Raman,
S.K.Karthikeyan, D.Dinesh. ( 2013),
Lean Manufacturing In Chassis
Assembly Through Poka-Yoke :
International Journal of Technology
Enhancements and Emerging
Engineering Research, 1(1) , 31-35.
Lasa, I.S., Laburu, C.O. and Vila, R.C.
(2008), An evaluation of the Value
Stream Mapping tool: Business
Process Management Journal, 14(1),
-52
Lummus, R.R., Vokurka, J. and Rodeghiero,
B. (2006), Improving quality through
Value Stream Mapping: a case study of
a physician’s clinic, Total Quality
Management Journal, 17( 8), 1063-75
M. Dudek-Burlikowska, D. Szewieczek
(2009). The Poka-Yoke method as an
improving quality tool of operations in
the process : Journal of Achievement in
Materials and Manufacturing
Engineering, 36(1), 95-101.
Mr. Parikshit S. Patil, Mr. Sangappa P. Parit,
Mr. Y.N. Burali (2013, February). The
Revolutionary Idea In Total Productive
Management: International Journal Of
Engineering And Science, 2(4), 19-24.
Maryam Ghasemaghaei (2010, November).
Service Poka Yoke. A case Study ,
Department of Management, University
of Isfahan, Isfahan, Iran 160 Cherry
Hill place Apt 1209, London ON, N6H
M4, Canada, 2(5), 12-16.
Nakamura M., Sakakibara, S., Schroeder, R.
G.,(1998), Adoption of just-in-time
manufacturing methods at US- and
Japanese-owned plants: Some
empirical evidence”, IEEE
Transactions on Engineering
Management, 45(3), 230-240
DOI: https://doi.org/10.58217/joce-ip.v14i1.213
Refbacks
- There are currently no refbacks.
LPPM Universitas Insan Pembangunan Indonesia
Jl. Raya Serang Km. 10 Bitung, Curug, Tangerang 15810
Telp. 021-59492836 / 02159492837
Website : http://www.lppm.ipem.ac.id
Email : lppm@ipem.ac.id
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-BerbagiSerupa 4.0 Internasional.